FAQs
Services
Join Us as an Expert
Blog
Rawasi Empowerment logo
Rawasi Empowerment
For Consulting and Training
HomeAbout Us

Programs

  • Training Courses
  • Upcoming Course Dates
  • Professional Certifications & Accreditations

Training add-ons

  • Free ToolsNew
  • Training Kits
Book your course
Professional CertificationsConsultingFree ToolsContact Us
Rawasi Empowerment logo
Rawasi EmpowermentFor Consulting and Training

We provide comprehensive solutions in training and consulting with professional standards that contribute to empowering individuals and developing organizations.

Payment Methods

madaVisaMastercardAmerican ExpressSTC PayApple PayMadfutabbyTamara

Commercial Registration

7001748636

Status: ActiveIssued: 27/02/2012

Quick Links

  • Home
  • About Us
  • Specialized Academies
  • Courses
  • All Sectors
  • Training Kits
  • Consulting Services
  • Blog
  • Contact Us
  • Join Us as an Expert

Our Services

  • Training and Qualification
  • Consulting Solutions
  • Quality and Excellence
  • Organizational Development
  • Digital Transformation Solutions

Contact Us

Main Branch:

Riyadh: Saudi Arabia
Amman: Hashemite Kingdom of Jordan
Muscat: Oman

Email:

[email protected]

Phone:

Saudi:+966 500 665 369Alt:+966 570 588 004
Talk to an ExpertAnalyze Your Training Needs for Free

© 2026 Rawasi Empowerment for Consulting and Training. All rights reserved.

Privacy PolicyTerms & ConditionsRefund PolicySitemap
Facilities and Enterprise Asset Management
CoursesBusiness Administration Courses in the Private Sector
Professional Training Program

Facilities and Enterprise Asset Management

Facilities and Enterprise Asset Management course designed to optimize facility operations, improve asset performance, reduce costs, enhance preventive maintenance, and achieve sustainable operational excellence.

Certificate Included
Expert-Led Training
Practical Learning
Enrollment Support
days
5 Days
Language
English / Arabic
Quotation Route

Request Schedule & Quotation

Online payment is not open for this course right now. Send your details and our training team will prepare the best schedule and quotation for you.

No public paid session is available now. Request a quotation and we will confirm schedule, seats, and pricing.
Course Summary
Request Schedule & Quotation

No online payment is open for this course yet. Our team can send you the suitable quotation.

Start Date
Flexible / Always Available
Certificate
Accredited Certificate
days
5 Days

Your quote arrives by email and in the client portal

Ask on WhatsApp
Course Details

Overview

The “Effective Facilities and Enterprise Asset Management” course is an advanced training program designed to enable participants to understand and apply the principles and methods of facilities and asset management efficiently and effectively. The course aims to maximize the value of physical and operational resources, extend asset lifecycle, reduce operating costs, and improve the work environment.

In light of the major urban and industrial expansion in the Kingdom of Saudi Arabia, and the growing direction of public and private organizations toward improving spending efficiency and managing assets according to international best practices — ISO 55000 — facilities and asset management has become a strategic function that directly contributes to achieving organizational objectives.

The course takes participants from fundamental concepts — such as the difference between a facility and an asset, the asset lifecycle, and types of maintenance — to advanced methodologies in facilities planning and management, including space planning, contract management, energy management, cleaning and security management, waste management, and small project management.

It also covers asset management topics, including asset registration, maintenance planning, reliability improvement, calculating Total Cost of Ownership — TCO — and risk management. The program is designed to be 70% practical through real case studies from Saudi facilities, such as hospitals, universities, government complexes, and corporate buildings, as well as exercises on using facilities management systems — CMMS, CAFM, and EAM — and preparing maintenance plans and performance indicators.

Objectives

Program Objectives

By the end of this course, participants will be able to:

  • Understand the difference between Facility Management and Asset Management.
    Facility Management — FM: The integration of people, processes, and technology to ensure safe, effective, and functional work environments.
    Asset Management — AM: A structured methodology for developing, operating, maintaining, and replacing assets in a cost-effective manner throughout their lifecycle.

  • Apply international asset management standards — ISO 55000, ISO 55001, and ISO 55002 — by understanding the requirements of an asset management system, applying it in Saudi organizations, and preparing asset policies and strategies.

  • Design and implement an integrated Computer-Aided Facility Management system — CAFM — by selecting and implementing the appropriate CAFM software, managing work orders, scheduling preventive maintenance, managing inventory, and preparing reports.

  • Manage the Asset Lifecycle, including planning, design and procurement, installation and operation, maintenance, renewal or replacement, and disposal. Participants will also calculate the Total Cost of Ownership — TCO — for each asset.

  • Apply Key Performance Indicators — KPIs — for facilities and asset management, including Energy Use Intensity — EUI, maintenance request response time, user satisfaction, equipment availability, and maintenance cost per square meter.

  • Manage facilities contracts and outsourced services by preparing contract specifications, selecting suppliers, managing contractor performance, monitoring quality, and handling violations and penalties.

Target Audience

Target Audience

  • Facility Managers and Supervisors in companies, government entities, hospitals, universities, and commercial complexes.

  • Maintenance and Asset Management Engineers.

  • Operations Managers responsible for facility efficiency.

  • Procurement and Contract Officers specialized in facilities services.

  • Health, Safety, and Environment — HSE — Officers working in facility environments.

  • Graduates of mechanical engineering, electrical engineering, civil engineering, and industrial management.

Competencies

Core Competencies

Preparing an Asset Management Plan for a Building or Facility

Define an Asset Register with relevant data, including location, date, manufacturer, warranty, and maintenance condition. Determine the maintenance strategy for each asset, such as preventive, predictive, or reactive maintenance, and estimate annual maintenance costs.

Calculating the Total Cost of Ownership — TCO — for Equipment, such as an Electrical Generator

Calculate the purchase cost, installation cost, energy consumption cost, periodic maintenance cost, repair cost, and disposal cost. Compare two brands using Total Cost of Ownership — TCO.

Applying the Overall Equipment Effectiveness — OEE — Indicator for a Small Factory

Calculate Overall Equipment Effectiveness — OEE — by multiplying Availability × Performance × Quality for a production line. Identify losses, such as downtime, reduced speed, and defects, and propose improvements to increase OEE.

Preparing a Planned Preventive Maintenance — PPM — Plan for a Central Air Conditioning System

Define maintenance tasks, such as cleaning filters, inspecting the compressor, checking oil, and checking pressure. Define frequencies, such as monthly, quarterly, and annually, identify required resources, including technicians and spare parts, and prepare a maintenance schedule.

Designing a Work Order System Using Excel or CAFM Software

Create a maintenance request form, including request number, date, location, fault description, and priority. Track request status, such as open, in progress, and closed, and measure response time and completion time.

Measuring Customer Satisfaction with Facilities Services

Design a satisfaction survey with 5–10 questions covering cleanliness, air conditioning, lighting, elevators, maintenance, security, and parking. Calculate the satisfaction index using a 1–5 scale.

Learning Journey

Program Outline

01

Day One: Fundamentals of Facilities and Asset Management, Core Concepts, and International Standards

Introduction to Facility Management — FM
Definition of FM according to ISO 41011: The integration of people, processes, and technology to ensure safe, effective, and functional work environments. Scope of FM: Space Management, Maintenance Management, environmental services management — cleaning, pest control, and landscaping — security and protection management, energy management, waste management, contract management, and small project management, such as renovations and improvements. Importance of FM in Saudi Arabia: Mega projects such as NEOM, Qiddiya, and The Red Sea Project require advanced FM systems to ensure asset sustainability.
Introduction to Asset Management — AM
Definition of AM: A structured methodology for developing, operating, maintaining, and replacing assets in a cost-effective manner throughout their lifecycle. Difference Between FM and AM: Asset Management focuses on individual assets, while Facility Management focuses on the overall environment and services. Asset Lifecycle: Planning and design. Procurement and installation. Operation and maintenance. Renewal or upgrade. Disposal.
Asset Management Standards — ISO 55000, ISO 55001, and ISO 55002
ISO 55000: Concepts and principles. ISO 55001: Requirements for an integrated asset management system. ISO 55002: Guidelines for implementing ISO 55001. Core Principles: Value Creation. Alignment with organizational objectives. Leadership. Assurance. ISO 55001 Requirements: Understanding the context. Leadership. Planning. Support. Operation. Performance evaluation. Improvement.
Asset Register and Inventory List
Asset Register Components: Unique Asset ID. Description, including name, model, and serial number. Location, including building, floor, and room. Purchase and installation date. Purchase cost. Warranty, including start and end dates. Asset condition, such as good, requires maintenance, or out of service. Maintenance type, such as preventive, predictive, or reactive. Photos or documents, such as the maintenance manual. Asset Recording Tools: Excel, Access, and CAFM/EAM software. Importance of the Asset Register: Maintenance planning, TCO calculation, warranty management, and replacement planning.
Practical Workshop: Preparing an Asset Register for a Small Building
Required Practical Activity — Small Working Groups: Use a small administrative building consisting of two floors, 5 rooms, 3 electrical panels, 2 central air conditioning units, 1 electrical generator, and 1 water pump. Prepare an Excel table to record the following assets: building assets, including panels, air conditioning units, generator, and pump. For each asset, define the description, location, assumed installation date, assumed purchase cost, asset condition, and proposed maintenance type. Discuss how the register can be used in maintenance planning.
Integration Between FM and AM — Maturity Model
Maturity Levels — 1 to 5: Reactive: Maintenance is performed only when a failure occurs. Managed: Scheduled preventive maintenance is in place. Systematic: CMMS/CAFM software is used, and performance is tracked. Integrated: FM is linked with AM and enterprise systems, such as ERP. Optimized: Performance is continuously improved using predictive analytics. Assess the maturity level of the participants’ facilities.
02

Day Two: Space Management and Facility Planning

Space Management
Definition: Planning, allocating, and using the internal spaces of buildings efficiently. Importance: Reducing rental costs, improving workflow, increasing employee satisfaction, and supporting a culture of collaboration. Types of Spaces: Private Offices, Open Plan Offices, meeting rooms, break areas, corridors, sanitary facilities, and storage areas. Space Efficiency Metrics: Space per Employee: Square meters per employee. The benchmark in Saudi Arabia is 10–15 square meters for administrative offices. Utilization Rate: Actually used space / Total space. Space Cost: SAR per square meter per year.
Facility Planning — Needs Analysis Methodology
Steps: Analyze current and future needs, including number of employees, equipment, and nature of work. Assess current spaces through inventory lists and utilization measurement. Develop alternative options, such as expansion, relocation, or redistribution. Evaluate the costs and benefits of each option. Implement the selected plan. Space Planning Tools: AutoCAD, Revit, CAFM Space Management Modules, and Excel.
Transportation and Parking Management
Parking Challenges in Saudi Cities: Congestion, shortage of parking spaces, and misuse of designated spaces, such as elderly and disabled parking. Parking Management Strategies: Allocate parking spaces to employees based on priority, such as senior management, employees, and visitors. Use electronic parking management systems, including smart gates and license plate recognition cameras. Encourage the use of alternative transportation, such as buses and carpooling. Apply parking fees to reduce demand. Performance Measurement: Number of parking spaces per 100 employees and average time spent searching for a parking space in minutes.
Practical Workshop: Planning Administrative Office Spaces
Required Practical Activity — Small Working Groups: Use a company with 50 employees: 5 senior management employees, 10 department managers, and 35 employees. Allocate employees within an office space of 500 square meters. Propose an office layout: Private offices for senior management — 15 square meters per office. Open plan offices for employees — 8 square meters per employee. Large meeting room — 50 square meters. Break room — 30 square meters. Server room — 20 square meters. Calculate the total required space and compare it with the available space. Propose redistribution if needed.
Health, Safety, and Environment Management in Facilities — HSE in Facilities
Common Risks in Buildings: Fire Risks: Electrical wiring, flammable materials, and emergency exits. Health Risks: Air quality, lighting, noise, and chemicals. Safety Risks: Stairs, slippery floors, and heavy equipment. Safety Procedures: Emergency evacuation plan, including exits, assembly points, and regular drills. Maintenance of fire protection systems. Indoor air quality inspection, including CO₂, humidity, and temperature. Provision of Personal Protective Equipment — PPE. Documentation: Incident register, training register, and periodic inspection register.
03

Day Three: Maintenance Management and Reliability Improvement

Types of Maintenance and Selecting the Appropriate Strategy
Reactive / Breakdown Maintenance: Repairing failures after they occur. Suitable for non-critical, low-cost assets. Preventive Maintenance — PM: Scheduled maintenance performed at defined intervals, such as monthly or every 500 operating hours. Suitable for assets subject to gradual wear. Predictive Maintenance — PdM: Based on monitoring asset condition, such as vibration, temperature, and oil analysis, to predict when a failure may occur. Suitable for critical and expensive assets. Reliability-Centered Maintenance — RCM: A systematic analysis used to determine the optimal maintenance strategy for each component. Condition-Based Maintenance — CBM: Similar to PdM, but based on predefined condition thresholds.
Planned Preventive Maintenance — PPM
Steps: Identify the assets that require preventive maintenance. Determine maintenance frequency based on manufacturer recommendations, experience, and failure analysis. Prepare checklists for each asset. Estimate required time and resources, including technicians, spare parts, and tools. Schedule maintenance using an annual calendar. Execute and document maintenance activities. Review performance by analyzing the effectiveness of preventive maintenance. Examples of PM Tasks for an Air Conditioning Unit: Monthly: Cleaning filters. Quarterly: Inspecting the compressor and refrigerant gas level. Annually: Inspecting bearings and cleaning the condenser.
Using Computerized Maintenance Management Systems — CMMS / CAFM
CMMS — Computerized Maintenance Management System: A software system used to manage maintenance operations, including work orders, asset records, spare parts, scheduling, and reports. CAFM — Computer-Aided Facility Management: A broader facility management system that covers spaces, contracts, energy, and maintenance. Key Features of CMMS: Centralized asset database. Automatic generation of Work Orders from the PM schedule. Spare parts inventory management. Cost tracking. Performance reports, such as MTBF, MTTR, and PM Compliance. Examples of CMMS/CAFM Software: Maximo, SAP PM, Maintenance Connection, FM, and Fiix.
Practical Workshop: Creating a Work Order in a Simulated CMMS System
Required Practical Activity — Small Working Groups: Use an Excel template that simulates a CMMS system. Receive a maintenance request: an air conditioning unit on the third floor is not working. Create a Work Order, including WO number, date, location, fault description, priority — high — and assigned technician. Add the required spare parts, such as filter and condenser. Record the start and completion time. Close the Work Order after repair by documenting the actions performed and the cost. Calculate Response Time and Completion Time.
Key Performance Indicators — KPIs — for Maintenance
PM Compliance: (Number of PM Work Orders completed on time / Total scheduled PM Work Orders) × 100. Target: More than 95% for critical assets. Mean Time Between Failures — MTBF: Total operating time / Number of failures. Mean Time To Repair — MTTR: Total downtime for repairs / Number of failures. Availability: MTBF / (MTBF + MTTR) × 100. Reactive Maintenance Ratio: (Labor hours spent on reactive maintenance / Total maintenance labor hours) × 100. Target: Less than 10%. Maintenance Cost per m²: Total maintenance cost / Building area. Customer Satisfaction with Maintenance: Measured through a satisfaction survey.
04

Day Four: Energy Management, Sustainability, Waste Management, and Cleaning Services

Energy Management in Facilities
Importance of Energy Management in Saudi Arabia: High energy consumption, especially from air conditioning and lighting, and the national direction toward energy efficiency in line with Vision 2030 and the Energy Efficiency Program. Energy Management Steps: Energy Audit: Measuring the consumption of major equipment, such as air conditioning systems, lighting, pumps, and elevators. Identifying Opportunities: Replacing lights with LED, installing motion sensors for lighting, improving building insulation, and maintaining air conditioning systems regularly. Implementing energy-saving measures. Measuring savings by calculating reductions in electricity bills. Continuous monitoring through an Energy Management System — EMS. Performance Metric: Energy Use Intensity — EUI = kWh per year / square meter.
Waste Management and Recycling
Types of Waste in Facilities: General Waste: Paper, plastic, glass, and food waste. Hazardous Waste: Batteries, paints, chemicals, and medical waste. Electronic Waste: Old devices and equipment. Waste Management Strategies Based on the Waste Hierarchy: Reduce: Purchase materials with less packaging and encourage the use of reusable cups. Reuse: Reuse furniture and equipment. Recycle: Sort waste using separate containers for paper, plastic, and glass, and contract with recycling companies. Recovery: Convert organic waste into compost or biogas. Disposal: Dispose of waste in sanitary landfills as the last option. Performance Measurement: Waste Diversion Rate from landfill = (Recycled weight + Reused weight) / Total waste weight × 100.
Cleaning Management and Pest Control
Cleaning Management: Define cleaning standards, including cleaning frequency: daily, weekly, and monthly. Prepare a cleaning plan covering responsibility areas, task checklists, tools, and materials. Select cleaning contractors by defining specifications and monitoring quality. Measure user satisfaction with cleaning services. Pest Control: Identify types of pests, such as rodents, insects, and birds. Apply preventive measures, such as sealing openings, storing food securely, and disposing of waste daily. Contract with a specialized pest control company on a regular and safe basis. Document all pest control procedures.
Practical Workshop: Conducting a Simple Energy Audit for an Office
Required Practical Activity — Small Working Groups: Use an office with an area of 200 square meters, including 20 fluorescent lamps — 40 watts each, 10 computers — 200 watts each, and 2 air conditioning units — 2,000 watts each. Working hours are 8 hours per day, 5 days per week. Calculate annual electricity consumption in kWh for each category. Propose improvements, such as replacing lamps with LED — 20 watts, adding motion sensors for lighting — 30% savings, and maintaining air conditioning units — 10% savings. Calculate annual savings in kWh and the percentage of savings. Estimate financial savings, assuming an electricity price of SAR 0.30 per kWh.
Contract Management and Outsourcing in Facilities
Common Outsourced Services: Cleaning. Security. Specialized maintenance, such as elevators, air conditioning systems, and fire protection systems. Landscaping. Waste management. Food services, such as cafeteria services. Contract Management Procedures: Prepare contract specifications, including scope of work, performance standards, Service Level Agreements — SLAs, and penalties. Issue the tender and select the supplier based on price, quality, and experience. Sign the contract. Monitor performance through KPIs, regular meetings, and reports. Handle complaints and non-conformance reports — NCRs. Evaluate the supplier at the end of the contract. Example of an SLA for a Cleaning Contractor: Clean offices daily, including floor mopping and emptying waste bins. Clean restrooms three times per day. Wash windows monthly. Delay penalty: Deduct 5% of the invoice value if cleaning is delayed beyond the specified time.
05

Day Five: Financial Planning, Risk Management, and Business Continuity

Facility Operating Budget
Budget Items: Salaries of facilities staff, including managers, supervisors, technicians, cleaning workers, and security staff. Building and equipment maintenance, including spare parts and external maintenance contracts. Utility services, including electricity, water, gas, telephone, and internet. Outsourced service contracts, including cleaning, security, pest control, and waste management. Operating materials, such as cleaning materials, oil, and filters. Capital improvement projects, such as building upgrades and purchasing new equipment. Contingency reserve, usually 5–10% of the total budget. Budget Preparation: Based on historical data and expected changes, such as expansion, inflation, and changes in energy prices. Budget Monitoring: Compare actual expenses with the monthly budget and analyze variances.
Total Cost of Ownership — TCO — for Assets
TCO Formula: TCO = Purchase Cost + Installation Cost + Energy Consumption Cost over the asset lifecycle + Maintenance Cost + Repair Cost + Downtime Cost + Disposal Cost. Practical Application: Compare two brands of air conditioning units: Brand A: Purchase price SAR 10,000, lifecycle 10 years, energy consumption 2,000 watts, and annual maintenance cost SAR 500. Brand B: Purchase price SAR 15,000, lifecycle 15 years, energy consumption 1,500 watts, and annual maintenance cost SAR 300. Calculate the TCO for each air conditioning unit over 10 years, assuming an electricity price of SAR 0.30 per kWh. Determine which unit is cheaper in the long term.
Risk Management in Facilities
Types of Risks: Safety Risks: Accidents, fires, and gas leaks. Health Risks: Air quality and infectious diseases. Operational Risks: Failure of critical equipment, power outage, and water outage. Financial Risks: Increased maintenance costs and non-compliance penalties. Legal Risks: Violations of building, safety, and environmental regulations. Risk Management Steps: Risk Identification. Risk Analysis: Estimating likelihood and impact. Risk Evaluation: Prioritizing risks as high, medium, or low. Risk Treatment: Avoid, transfer — such as insurance — mitigate through preventive actions, or accept. Monitoring and Review. Example: Preparing a Risk Matrix for fire risks.
Business Continuity in Facilities
Definition of BCM: The facility’s ability to continue delivering essential services during and after an incident or disaster. Steps: Business Impact Analysis — BIA: Identifying critical operations and the Maximum Tolerable Downtime — MTD. Recovery Strategies: Recovery at an alternative site, such as a Hot Site or Cold Site, and cloud-based recovery. Developing a Business Continuity Plan — BCP. Testing the plan through drills. Examples of Emergency Scenarios in Facilities: Power outage, managed through backup generators and UPS systems. Water outage, managed through backup tanks. Fire, managed through evacuation and fire suppression. Hurricane or flood, managed through property protection and evacuation.
Comprehensive Case Study — Final Application
Scenario: A real estate company manages a commercial complex with an area of 50,000 square meters, 100 retail stores, 5 office floors, and parking spaces for 1,000 cars. Challenges: High electricity bill, reaching SAR 2 million annually. Frequent tenant complaints regarding air conditioning and elevator failures. Absence of a centralized maintenance request management system. Maintenance contracts with unreliable contractors. Parking congestion. Required Practical Activity — Small Working Groups: Prepare a 12-month facilities management improvement plan that includes: A maintenance request management system — CAFM. A preventive maintenance plan for air conditioning systems and elevators. An energy audit and energy-saving recommendations, such as LED lighting, sensors, and maintenance. Parking management, including gate systems and parking allocation. Prepare an estimated operating budget for the next year. Prepare a fire emergency plan, including evacuation and drills. Present the plan to senior management using PowerPoint.
Final Assessment and Course Review:
Short objective questions covering the concepts of FM, AM, ISO 55000, PPM, CMMS, KPIs, TCO, Energy Management, and BCP. Review of the key points covered over the five training days.
Facilities and Enterprise Asset Management course image
Enrollment Summary
Secure Course Registration
Request Schedule & Quotation

No online payment is open for this course yet. Our team can send you the suitable quotation.

Request an official quotation in your organisation's name. Our corporate solutions team prepares it and emails it within one business day.

Saudi Arabia+966
Choose your certificate

The certificate this course awards. Your quote is prepared for it.

Local certificate (Rawasi / TVTC)LocalCertificate issued by Rawasi Training Institute or the Technical and Vocational Training Corporation (TVTC).

A local certificate issued by Rawasi Training Institute, a training provider licensed by the Technical and Vocational Training Corporation (TVTC). Recognised by employers across Saudi Arabia.

Issued by
Rawasi Training InstituteRawasiTechnical and Vocational Training Corporation (TVTC)TVTC

Quick security check — complete it to enable sending

Your quote arrives by email and in the client portal

Ask on WhatsApp
You may also like

More courses open for booking

Confirmed sessions with a set date and price — book your seat and pay online

Business Development Manager Preparation and Building Growth Opportunities - Rawasi Empowerment
Confirmed session — instant booking
Business Administration Courses in the Private SectorRelated

Business Development Manager Preparation and Building Growth Opportunities

Accredited: Western State University, American Management Institute, The CPD Group
Certificate accredited by
  • Western State UniversityWestern State University
  • American Management InstituteAmerican Management Institute
  • The CPD GroupThe CPD Group

A specialized training program designed to equip participants with essential business development skills, including identifying growth opportunities, market analysis, building strategic partnerships, managing business relationships, and developing sales and negotiation strategies to increase revenue, enhance competitiveness, and drive sustainable organizational growth.

  • Starts Sunday 13 December 2026
  • Online
  • 6:00–10:00 PMRiyadh time
Reserve your seat by quotation
Send your request → get your quote → confirm your seat
Book your seatWant it delivered for your organisation?
Procurement and Contracts Specialist - Rawasi Empowerment
Confirmed session — instant booking
Business Administration Courses in the Private SectorRelated

Procurement and Contracts Specialist

Accredited: The CPD Group, American Management Institute, Western State University
Certificate accredited by
  • The CPD GroupThe CPD Group
  • American Management InstituteAmerican Management Institute
  • Western State UniversityWestern State University
  • Starts Sunday 20 December 2026
  • Online
  • 6:00–10:00 PMRiyadh time
Reserve your seat by quotation
Send your request → get your quote → confirm your seat
International certificate available
Book your seatWant it delivered for your organisation?
Anti-Money Laundering and Countering the Financing of Terrorism for Legal and Regulatory Roles - Rawasi Empowerment
Confirmed session — instant booking
Legal Programs for Lawyers and Legal Professionals

Anti-Money Laundering and Countering the Financing of Terrorism for Legal and Regulatory Roles

Accredited: American Management Institute, Western State University
Certificate accredited by
  • American Management InstituteAmerican Management Institute
  • Western State UniversityWestern State University

A specialized training program designed to equip participants with the knowledge and practical skills to identify and manage money laundering and terrorist financing risks, understand regulatory frameworks and international standards, implement customer due diligence procedures, detect and report suspicious transactions, and strengthen organizational compliance against financial crime

  • Starts Sunday 27 December 2026
  • Online
  • 6:00–10:00 PMRiyadh time
Reserve your seat by quotation
Send your request → get your quote → confirm your seat
International certificate available
Book your seatWant it delivered for your organisation?
QA/QC Quality Control in Contracting and Construction Projects - Rawasi Empowerment
Confirmed session — instant booking
Construction, Risk Management, and Occupational Safety

QA/QC Quality Control in Contracting and Construction Projects

Accredited: American Management Institute, Western State University
Certificate accredited by
  • American Management InstituteAmerican Management Institute
  • Western State UniversityWestern State University

A specialized, practice-oriented training program designed to develop Quality Assurance and Quality Control (QA/QC) competencies in construction and contracting projects. The program covers quality management systems, construction codes and standards, inspection and testing procedures, Quality Assurance Plans (QAP), and Inspection and Test Plans (ITP). It focuses on Non-Conformance Reports (NCR), material and workmanship inspections, technical documentation, and compliance with ISO 9001 and rele

  • Starts Sunday 6 December 2026
  • Online
  • 7:00–10:00 PMRiyadh time
Reserve your seat by quotation
Send your request → get your quote → confirm your seat
International certificate available
Book your seatWant it delivered for your organisation?
Registration is open

Upcoming Course Dates

Every course with a confirmed date in one schedule: compare dates, venues and prices, pick your session and book your seat online.

View course dates
A quote for your organisation
Your quote arrives by email and in the client portal